GSM gold starGSM Global
中文版 · Chinese

Kuala Lumpur Cuts Flash Flood Hotspots From 31 to 14, With RM27 Million Allocated for Next Year

Monday, November 16, 2026 · World · GSM News

Kuala Lumpur City Hall (DBKL) has been asked to present its governance practices and flash flood mitigation measures in the capital to Prime Minister Anwar Ibrahim, ahead of the northeast monsoon and a possible Super El Nino phenomenon next year, Minister in the Prime Minister's Department (Federal Territories) Hannah Yeoh said after a meeting of the Federal Territories State Disaster Management Committee.

Yeoh said DBKL's mitigation efforts had reduced the number of flash flood hotspots in Kuala Lumpur from 31 in 2022 to 14 this year, with a target of bringing the figure down to 10 by the end of the year. All DBKL branch offices in the capital's parliamentary constituencies must provide real-time reports to the mayor whenever it rains, enabling immediate coordinated action, and two task forces are focusing on enhancing flood mitigation and turning open spaces into water-absorbing areas under the sponge city concept.

Kuala Lumpur Mayor Fadlun Mak Ujud said DBKL has allocated RM27 million for next year to continue efforts to reduce the number of hotspots to 10 or fewer. Drainage systems, rivers and retention ponds are now maintained quarterly, up from twice a year, and maintenance will be stepped up to every two months during the monsoon season, with seven contractors handling drainage systems and 12 maintaining retention ponds. Roadside drainage inlets will also be modified to improve rainwater flow, and DBKL has deployed 180-horsepower pumps at 10 low-lying areas to pump excess water into rivers.

DBKL has completed nine on-site detention ponds, is building six more and plans another six in 2027, is monitoring more than 65 privately developed ponds, and has completed a 1.3km flood barrier. It has also activated an operations room to monitor weather conditions, obtain forecasts one to two hours in advance, coordinate response efforts and issue early warnings to residents in flood-prone areas.

Yeoh added that 4,162 personnel from various Federal Territories agencies are ready to respond to any eventuality, with 139 lorries, 60 boats and 144 four-wheel-drive vehicles at their disposal, and that 120 temporary relief centres have been prepared, with capacity to accommodate up to 31,000 flood victims at once.

(Source: Kuala Lumpur City Hall (DBKL))

Source: Kuala Lumpur City Hall (DBKL

Published by GSM · USA (original Chinese edition)

Photo: 图:吉隆坡街头在暴雨中严重积水,车辆涉水通行(资料图)。 / Photo: A Kuala Lumpur street under deep floodwater during heavy rain (file photo).

Latest in World